“Data centers drain local water supplies.”
Depends on designEvaporative sites can consume millions of gallons a day; closed-loop sites use about as much as an office building. See water facts.
Facts · Last reviewed November 7, 2026
For each issue: the key numbers, the strongest sourced evidence supporters and critics point to, and what is still uncertain. Every figure links to its source.
How much water a data center uses depends mostly on how it is cooled. Evaporative systems consume water continuously; closed-loop systems recirculate the same water. Power plants that supply data centers also use water.
Still uncertain: most companies do not report water use site by site, and national totals rely on estimates. Closed-loop designs save water but use somewhat more electricity.
National figures: Lawrence Berkeley National Laboratory 2024 report, via The Conversation; MOST Policy Initiative.
Data centers are the fastest-growing source of U.S. electricity demand. Whether that raises or lowers household bills depends on spare grid capacity and how utilities divide the cost of new plants and power lines.
Still uncertain: the EPRI result covers a period with spare grid capacity; the same study warns the benefit may disappear in the busiest markets as AI demand grows.
Share of electricity: Lawrence Berkeley National Laboratory, 2025 update.
Data centers can pay large local property taxes while states forgo sales tax on their equipment. Construction employs many people; operations employ relatively few.
Still uncertain: local tax benefits are concentrated where data centers cluster; it is debated whether state incentives decide where they locate or simply subsidize choices already made.
Cooling equipment, fans and backup generators produce both ordinary noise and low-frequency sound. Average decibel readings capture the first well and the second poorly.
Still uncertain: few local codes regulate low-frequency sound, so complaints and compliance readings often don’t match.
Kent County limit: Technical.ly, Jul 2026.
Data centers keep diesel generators for power outages and test them regularly. Their permits allow far more running time than they normally use.
Still uncertain: how often generators would run during a long grid emergency, when many could start at once.
Data center campuses are growing fast in size, and developers increasingly look to rural and farm land with access to power lines.
Still uncertain: no national count of farmland converted to data centers exists yet.
Campus trends: Mission Critical.
Claims heard on both sides, rated against the evidence above.
“Data centers drain local water supplies.”
Depends on designEvaporative sites can consume millions of gallons a day; closed-loop sites use about as much as an office building. See water facts.
“Data centers raise everyone’s power bills.”
ContestedThey lowered rates in many states from 2019 to 2024, but forecasts show increases ahead, especially in Virginia and the PJM grid region. See electricity facts.
“Data centers bring lots of jobs.”
Partly trueConstruction employs many workers for a few years; permanent operating jobs are relatively few for the investment. See jobs & taxes.
“Data centers pay their way in taxes.”
Partly trueTrue locally where they cluster — 39% of Loudoun County’s budget — while states give up large amounts in sales tax. See jobs & taxes.
“Data centers are quiet.”
Partly trueTypical readings are moderate, but low-frequency hum near some sites is real and poorly measured by standard meters. See noise facts.